Glodon Rebar Takeoff Application (Hospital)
-
1 Mandalay Road, Singapore
-
Project Type & Description: Hospital
-
Gross Floor Area: 40,658.57㎡
-
Total Construction Period: 205 Calendars Week
-
Glodon Products Involved: TAS, TRB
Catering to QS Rules Based on Singapore Method of Measurements
Project Description
Location:
1 Mandalay Road, Singapore
Type: Hospital
Floors: 10 Floors + 2 Basement
GFA: 40,658.57 ㎡
Duration: 205 Calendars Week
??
Comparison
Priorities and Difficulties in QS' Manual Calculation
1. Time-consuming to analyze and identify
2. Preparation time to set up the excel format
Strength of Software Application
1. 3D view for better visualization and clarity of model designed. Able to capture missing elements easily from 1 look at the building
2. Help us to easily identify the missing elements
3. Auto-generation of quantities for TAS after completion in TRB.