-
Bedok South MRT Station and Tunnels
-
Bedok, Singapore
-
Project Type & Description: MRT Station
-
Glodon Products Involved: TAS&TRB
Bedok South MRT Station and Tunnels
Project Location:
Bedok, Singapore
Project Type:
MRT Station
Project Overview:
Set to be completed by 2024, Bedok South MRT Station is an underground station located along the Thomson-East Coast Line. It is built just off Upper East Coast Road, near the junction with Bedok South Road, bringing rail connectivity to schools and residential developments around the area.
Client:
MCC Land (S) Pte Ltd
Singapore’s top 10 real estate developers
Core Benefits:
Reduce Costs and Manpower
Cubicost Solutions help to improve the overall cost estimation process. It streamlines the work and helps to minimize human errors. It greatly improves the quantity takeoff process and helps in cost savings & labor reduction.
Better Communication and Collaboration
With 3D model view to the projects, it allowed the project stakeholders to have a better view and insights on the projects as the quantity information are shown clearly in the 3D model views, it helps to minimize the risk of errors and for better communication and collaboration.
Improve Project Accuracy
Cubicost Solution enables us to achieve more accurate estimation results as compared to the Traditional QTO method. Compared to the Traditional 2D drawing, the 3D model provides more insightful results and better visualization of the whole project. As a result, the cost estimations are more accurate and realistic.